Mechanical Testing |
Price US$ |
Test on Refractory Metals |
Price US$ |
| Tensile/Transverse/Compression Test |
6.00 |
Water Absorption |
6.00 |
| Tensile Test with Proof Stress and Stress/Strain Diagram with Electronic Extensometer |
12.00 |
Bulk Density / Apparent Porosity |
6.00 |
|
Tensile Test with 0.2% Proof Stress & Modulus of Elasticity |
16.00 |
Acid Resistance |
20.00 |
|
Tensile Test of Fine Wires/Foils < 1mm |
7.00 |
Acid Resistance per IS-7087 |
100.00 |
| Tensile Test for CTD Bars (upto 20mm. Dia) |
6.00 |
|
|
| Tensile Test for CTD Bars (over 20mm. Dia) |
10.00 |
Chemical Analysis |
|
| Bend/Flattening Test |
3.00 |
Wet Analysis |
|
| Flaring/Flanging Test |
3.00 |
First Element (excluding base element) |
|
| Hardness/ Ball Test |
3.00 |
Ferrous Metals |
5.00 |
| Weldability Test |
16.00 |
Non-Ferrous Metals |
8.00 |
| Sectional Weight of CTD Bars |
3.00 |
Others |
16.00 |
| Welding Charges for over 25mm. Dia |
2.00 |
Each additional Element |
|
|
|
Ferrous Metals |
4.00 |
Macro Etch Test |
|
Non-Ferrous Metals |
5.00 |
| Macroetch Test (upto 100mm) |
5.00 |
Others |
12.00 |
| Macroetch Test (between 100-200mm) |
8.00 |
Nitrogen, Boron, Palladium |
10.00 |
| MacroetchTest (over 200mm) |
12.00 |
Purity of Al, Zn, Pb, Ni, Bi, Cd |
28.00 |
| Microexamination (routine) |
16.00 |
Purity of Sn, Mg, W, Ti or base element |
28.00 |
| Microexamination (for failure studies) |
2.00 |
|
|
| Mounting Charges for small specimen |
2.00 |
Spectrometer Analysis |
|
| Microphoto (each Mag./Location) |
3.00 |
|
|
| Microhardness Test (3 indentations) |
12.00 |
Complete Analysis (upto 8 elements) |
|
| Rebend Test |
5.00 |
LAS / SS |
18.00 |
| Reverse Bend Test |
4.00 |
Non Ferrous |
28.00 |
|
|
Each Additional Element (Ferrous) |
3.00 |
| Impact Test (R.T.) as per IS/BS standard |
6.00 |
Each Additional Element (Non-Ferrous) |
4.00 |
| Impact Test (R.T.) as per ASTM standard |
7.00 |
Impurities in PPM (AAS/ICP) |
12.00 |
| Impact Test (upto -60 deg.) as per IS/BS |
8.00 |
Charges for sample weight more than 1kg. |
2.00/kg |
| Impact Test (upto -60 deg.) per ASTM |
8.00 |
|
|
| Impact Test (below -60 deg) as per IS/BS |
8.00 |
Inter-Granular Corrosion (IGC) Test |
| Impact Test (below -60 deg) as per ASTM |
9.00 |
|
|
| Hydraulic / Pneumatic Test |
15.00 & up |
ASTM A-262 Practice A test |
16.00 |
| Compression test of spring (upto 3 readings) |
16.00 |
ASTM A-262 Practice A test with photographs |
20.00 |
| Shear Test |
12.00 |
ASTM A-262 Practice B test |
80.00 |
| Ferrite Content Test (Analog) |
8.00 |
ASTM A-262 Practice C test |
120.00 |
| Ferrite Content Test (Digital) |
12.00 |
ASTM A-262 Practice D test |
60.00 |
| Wedge Load/Head Soundness Test |
12.00 |
ASTM A-262 Practice E test (24 hour) |
32.00 |
| Proof Load Test on Nuts / Bolts |
8.00 |
ASTM A-262 Practice E test (72 hour) |
60.00 |
|
|
ASTM A 262 Practice F |
80.00 |
Miscellaneous Test |
|
|
|
| Thermal Shock Test (1st Glass) |
12.00 |
|
|
| Each additional glass |
6.00 |
Charges for the following tests quoted on request |
| Zinc Coating Test (each) |
8.00 |
Failure Analysis |
| Mercurous Nitrate Test |
12.00 |
Qualitative Analysis (PMI Test) |
| Persulphate Test on tinned wires |
20.00 |
Ultrasonic Test |
| Surface characteristic of CTD bars |
10.00 |
Magnetic Particle Test |
| Coating Test (Chemical Method) |
16.00 |
Dye Penetrant Test |
| Proof Load / Slip Test on fabricated items such as clamps and assemblies |
16.00 |
In-Situ Metallography and Replica Examination on SEM, TEM and EDAX |
| Erichsen Cupping Test |
3.00 |
Heat Treatment of Coupons |
| Proof Load Test on Toughened Glasses 1st glass |
3.00 |
Inspection Services |
| Proof Load Test - each additional glass |
6.00 |
NACE Corrosion Tests like HIC and SSCC |
| Cleanliness Test |
16.00 |
Pitting Corrosion Test |
| Non Conventional and Heavy Items (Load test) |
80.00/hour |
Crevice Corrosion Test |
| Image Analysis & Measurement on Microscope |
20.00 & up |
Chloride Stress Corrosion Test |
| Inclusion Rating |
36.00 |
RoHS Compliance Testing |
Sample preparation and machining charges are extra.
to view the Machining Charges to prepare a correct test specimen.
Service tax @12.24% extra. Top priority testing for out of turn /urgent assignments will be charged 50% extra with full payment in advance. Fitting and Welding charges extra for Hydraulic and Pneumatic tests. Costs at actuals for transportation to on-site location.Transportation costs extra and billed at actuals.