Failure Analysis project from Adani Power Plant
- Rohit Bafna
- Jul 9, 2014
- 1 min read
TCR Advanced has bagged an order from Adani power plant for Providing service for Boiler Tube Failure Analysis on as and when required basis for 5x660 MW, Tiroda Thermal Power Plant at Village: Tiroda, Dist. Gondia, Maharashtra.
