TCR Engineering
Case Studies
HMEL Bathinda ran isomerisation reactor 503-R-001 to 2019 without a shutdown after a 710 degree Celsius excursion. Adani Power Mundra had 4,620 MW of boiler and piping assessed at twenty days a unit.
Request a Quote
Overview
TCR Engineering's case record is dated and referenced: ten marquee engagements below, from FFS on refinery reactors to fleet-scale boiler RLA, each carrying its reference, standard and measured outcome. Full case-study pages publish here as the insight programme grows.
Marquee engagements
-
Saudi Aramco Internal RT Crawler
SAER-13115 (8 Sept 2025) names TCR as technology provider; USD 4,980,000 documented cost avoidance over 5 years (~80% reduction). Range 16-52 inch. How the RT crawler technique won Aramco's approval →
-
HMEL Bathinda Isomerization Reactor 503-R-001 FFS
March 2012 temperature excursion (peak 710 °C); full damage-mechanism workup incl. HTHA per API 941; in-situ replication at 60 locations. Certified fit-for-service, monitored to 2019, no shutdown. Integrity despite defects: the FFS method →
-
18,000 MT Refrigerated Liquid Ammonia Tank FFS
API 620 Appendix R; Leak-Before-Break fracture mechanics via Failure Assessment Diagram. Ammonia tank integrity using risk-based inspection →
-
Saudi Aramco Jafurah Gas Compression Plants ECA
PWIS Package-1; ECA of 42-inch girth welds (2024-2025) per API 1104 Annex A Option 2, six CTOD tests per pipeline. ECA of girth welds per API 1104 Annex A →
-
Reliance Industries Jamnagar
1,200 in-situ metallographic replicas in 15 days during a turnaround window. In-situ microstructure replica analysis →
-
Adani Power Mundra
RLA of 4,620 MW boiler and piping fleet under IBR Reg 391A at 20 days/unit. The Adani Power failure investigation →
-
Sour-service line pipe for a PDO project
Yangzhou Chengde Steel Pipe Co., Ltd., 1 August 2024. HIC per NACE TM0284 (96 hours) and four-point bend SSC per NACE TM0177 and ASTM G39 (720 hours at 80% of actual yield strength). The purchase order specified atmospheric pressure and a 5 bar H2S partial pressure on the same line; the operator-approved procedure is where that was settled, before the specimens went in. How the contradiction was caught before hour 720 →
-
Mumbai-Ahmedabad HSR (NHSRCL)
VMAC No. 13 (23 Oct 2023); all three civil packages since March 2024 (MEIL-HCC C1, Afcons C2, L&T C3).
-
BMC robotic underwater bridge programme
March 2026, 400+ bridges, AI-assisted.
-
QAFCO Qatar
15-year metallurgical rate contract.