Reformer Tube Inspection Services Petrochemical: Why Your Plant's Future Depends on Getting This Right
ARTiS revolutionises reformer tube inspection with Level III FFS assessment per API 579, predicting failures months ahead of traditional methods.
Group
Insights · Chemicals
11 published articles carry the Chemicals tag, the most recent dated 2025-09-23. Every one is written from work done on the bench, not from the brochure.
Request a QuoteEvery published TCR Engineering insight tagged to Chemicals: 11 articles, newest first, on the testing, inspection and integrity work this sector runs on.
ARTiS revolutionises reformer tube inspection with Level III FFS assessment per API 579, predicting failures months ahead of traditional methods.
Mr. Paresh Haribhakti's paper was on Fitness for Service (FFS)
TCR Arabia participated in this event at Al-Jubail where the company got to meet all SABIC affiliates.
TCR Arabia signs contract with China National Chemical Engineering Company
TCR Arabia was invited to participate in this meet.
TCR Arabia’s contract # is 4600006798 valid from 10-7-2012 to 9-7-2017
TCR Arabia participated in SABTANK Reliability Awareness campaign
Long term corrosion mapping project in the Methanol and MTBE plant of IBN-SINA
Letter from Advanced Petrochemical Company, KSA for ToFD inspections
TCR provided QA/QC Inspection Engineers and NDT Level II qualified Radiography Technicians.
TCR Arabia supplied 10 Multiskilled Technicians and 7 Inspection Engineers for the SIPCHEM turnaround.